Site Photos
Mr. Abdul Rawoof Cheif Surveyor of KAPSARC project under DRAKE & SKULL company. after SEELE company left the project he is the one who take the charge of survey work on his shoulder.
He used to make advance method in Survey work and figure out all Problem which come across During the survey work.under his supervision nearly 22 Survey crew teams working in Kapsarc Project site..
He used to provide data and he use to explain the surveyors about the work.
His soft nature and peace of mind controls the atmosphere.
MR.MUHAMMED IHTESHAM as Asst. Chief Surveyor of DRAKE& SKULL COMPANY.
He is talented in site work and drafting the drawings of the project. if any surveyor get problems on site he is the one who use to go and solve the problem.
He was expert in site work because he is the one surveyor who is working from starting of the project under the SEELE company
MR.MUHAMMED IHTESHAM as Asst. Chief Surveyor of DRAKE& SKULL COMPANY.
He is talented in site work and drafting the drawings of the project. if any surveyor get problems on site he is the one who use to go and solve the problem.
He was expert in site work because he is the one surveyor who is working from starting of the project under the SEELE company
Turki Al-Utaibi Surveyors Mr.Syed Khaja Afzal Hussain (top) and Mr. mohammed Ihtesham uddin (bottom)
Well experienced in ROOF RAILING SYSTEM 3D alignment at KAPSARC Project in Riyadh.
Photo taken during survey points setting out for the railing system 3D – alignment. If ordinary surveyors will deal with this type of job using only 2D setting then it will not be possible. But due to the trainings we have received from the Filipino surveyors from seele as implemented by Engr.Roque Villaneza III and its staff, with the survey softwares that they have have personally designed and developed for the railing system 3D setting out calculations for pocket calculators, it makes the work faster and accurate from 0 up to +/-1mm.
The key to high accuracy survey works is the correct and very stable positioning of the your survey instruments where it is safe, away from possible disturbance and of course the surveyors who perform the job who has excellent capabilities and good knowledge in theory and application on how the system works for different types of contruction survey.
Turki Al-Utaibi Surveyor Mr. Awais Kharne (top photo)
Well experienced in ROOF RAILING SYSTEM 3D alignment at KAPSARC Project in Riyadh.
Turki Al-Utaibi Surveyor Mr. Samiuddin (bottom photo)
Photo taken during setting of the fixpoints and the alignment of the wall railing system of RCT building at KAPSARC Project in Riyadh.
The Turki Al-Utaibi surveyors are well versed in 3D setting out and alignment.
The Turki Al-Utaibi Survey team crews together with seele senior surveyors Mr.Edilberto Cabanlit (on the farright) and Mr.Nebo Allen Torres (on far bottom right).
This photo was taken after the safety training on firefighting has been conducted near CCT building of KAPSARC Project in Riyadh.
Turki Al-Utaibi surveyor Mr. Mirza Mahemood Baig in action prior to the concrete pouring of slabs, wall and columns under S.k company in Riyadh.
A reference elevation must be set out for concrete pour guide thus ensuring the thickness of concrete coverings of the structures within tolerance.
Turki Al-Utaibi senior surveyor Mr. Afsir Hussain during the construction survey works done at Princess Noora University for Women project under Saudi Oger company in Riyadh.
This is one of the recent projects that we have completed among the dozens.
Turki Al-Utaibi senior surveyor Mr. Afsir Hussain during the construction survey works done at Princess Noora University for Women project under Saudi Oger company in Riyadh.
This is one of the recent projects that we have completed among the dozens.
Turki Al-Utaibi Surveyors working on PP-11 Power Plant project at Druma in RiyadhunderHyundai Heavy Industires Co Ltd,
Mechanical survey works always involve an intricate survey setting out and calculation in order to achieve an accurate position for the pre-fabricated steels/material to fit just right in.
GPS Surveyors of Turki Al-Utaibi.
Photos taken during the detailed topographic survey done in ARAFAT project in Mecca.
And during the extension of double road project from ShaqaratoDoadmi.
GPS surveying is ideal for topographic surveys and road route surveys where the site situation is wide open and no high rise buildings or high walls nearby where the signals can be affected and creates ghosting effects.
Another power plant project that Turki Al-Utaibi Surveyors has work with.
This is the PP-10 Power Plant at Al-kharj in Riyadh. We are survey contractors under SIEMENS company.
Turki Al-Utaibi surveyor Mr. Mohammed Yasin Baig in action prior to the Allignment of secondary steel on steel beams under Unger company in Riyadh at Kapsarc project.
Turki Al-Utaibisurveyor Mr. Mohammed Aleem in action prior to the Allignment of GFRC panel under Unger company in Riyadh at Kapsarc Project.
HYUNDAI HEAVY INDUSTRIES WINS $3.3 BILLION STEAM POWER PROJECT IN SHUQAIQ K.S.A …HYUNDAI
An aerial view of the Jeddah South Thermal Power Plant with the same capacity (2,640MW) as the Shuqaiq Steam Power Plant
Hyundai Heavy Industries won an order for the project of building a super large scale steam power plant from Saudi Arabia in value of about $3.3 billion (approximately 3.7 trillion won).
Hyundai Heavy Industries held on August 4 the ceremony of concluding a contract with Saudi Electricity Company (SEC) in Riyadh for constructing the Shuqaiq Steam Power Plant in Saudi Arabia. The signing ceremony was attended by President Lee Jae-seong of Hyundai Heavy Industries, Chairman of Board Saleh Hussein Al-Awaji of SEC, and President Ali Bin Saleh Al-Barrak of SEC.
The Shuqaiq Steam Power Plant is a 2,640MW heavy oil-fired supercritical pressure thermal power plant to be constructed as part of SEC’s long-term program of expanding power generation facilities.
Hyundai Heavy Industries already constructed power plants in Marafiq and Riyadh, and when construction of the Jeddah South and Shuqaiq power plants are completed, the company will have built 4 power plants in Saudi Arabia with total capacity of 12,000MW, representing about 20% of the entire power output in the country.
The Shuqaiq Steam Power Plant will be constructed on the Red Sea coast, about 135 kilometers to the north of Jizan in southwestern part of Saudi Arabia, by 2017. Hyundai Heavy Industries will carry out the construction project on a turnkey basis, including engineering, procurement, construction, testing and commissioning.
Having taken part in the technical proposal-based tender in November 2012, Hyundai Heavy Industries was selected as the preferred bidder in May this year after fierce competition with about a dozen world leading plant construction companies.
Attributing to firm confidence of SEC in Hyundai Heavy Industries’ excellent technology and ability to carry out plant construction project, the latter could win the Shuqaiq Steam Power Plant project in less than a year after it received an order for the project of constructing the $3.2 billion Jeddah South Thermal Power Plant from SEC in October 2012.
In particular, awarding orders for super large scale projects to the same company consecutively is regarded as a very exceptional case in the plant construction industry because it may cause glitches in securing design manpower, management of construction works and supply of materials.
Executive Director Cheon In-su of Plant Business Division at Hyundai Heavy Industries said, “Thanks to high oil prices, steady increase in population and economic growth despite recent global recession, countries in the Middle East are actively investing in key industries. As it puts top priority on expansion of power generation and desalination facilities for welfare of the people, the Saudi Arabian government, among these countries, is expected to place orders for such projects in the future.”
TURKI – AL – OTHAIBI COMPANY:Turki surveyors working as consultant in this project. Nearly 20 surveyors working with Hyundai company in Jeedah and shuqaiq project.
Shuqaiq project is leading by Turki Senior Surveyor Mr.MohammedSaleem&Mr.MohdAwais under them nearly 8 turki surveyors doing joint survey and checking the work of sub contract companies.
MR. Mohammed Saleem senior surveyor of Turki-Al-othaibi company working with Gps in shuqaiq project under Hyundai Company.
Mr. Syed Rashad Turki -Al – othaibi surveyor under Hyundai company checking the work of sub -contractor..If the work in under tolerance it will be pass if its not under tolerance then it will not pass by our surveyor.